Featured Projects
Municipal Builders, Inc. has had the opportunity to work on many
projects throughout the years the following are a few of the more
notable ones.
![]()
Zimmerman, MN WWTF Improvements - Phase
1
Engineer:
Donahue & Associates
Contract Price:
$1,849,838
Date Completed: October
2010
-
New construction of two new Aerobic Digester tanks
-
Converted existing Aerobic Digester into a Sequencing Batch Reactor (SBR)
-
Replaced Aerobic Digester blowers
-
Existing plant needed to stay operational during construction
Wayzata, MN WTP No. 3
Engineer:
Bonestroo
Contract Price:
$3,823,210
Date Completed: June 2010
-
New construction of 2.9 MGD water treatment plant
-
Two 1000 GPM gravity filters from Tonka Equipment Company
-
Demolition of existing water treatment plant
-
500,000 gallon ground storage tank under the plant
-
Extremely small jobsite
__________________________________________________________________
Isanti, MN WTP
Engineer:
Bolton & Menk
Contract Price:
$4,020,000
Date Completed: October
2009
-
New construction of 4.1 MGD water treatment plant
-
Four 712 gpm pressure filters from Siemens Technology
-
Backwash tank with adjustable head wash-down system
-
Chlorine system by Miox with two brine silos
-
250 kw on site generator
__________________________________________________________________
Princeton, MN WTP No. 2
Engineer:
Short Elliott Hendrickson
Contract Price:
$3,095,300
Date Completed:
May 2008
-
New construction of 2 MGD water treatment plant
-
Twin 750 gpm pressure filters from Siemens Technology
-
Backwash tank with adjustable head wash-down system
-
Chemical feed systems
-
Public restroom with automated door locking system
__________________________________________________________________
North Branch, MN WTP No. 2
Engineer:
WSB
Contract Price:
$6,600,500
Date Completed:
June 2008
-
New 3.6 MGD water treatment plant
-
21,150 s/f precast tilt-up building with double tee roof
-
1 million gallon water storage reservoir with architectural exterior finish and a domed, poured in place roof
-
Two backwash tanks with wash-down capabilities and floating suction strainer reclaim systems
-
Aluminum aeration vessel with poured concrete detention tank
-
Two 10' diameter by 52' long four cell pressure filters by Tonka Equipment
-
Office wing complete with chlorine, fluoride, polymer, ortho-phosphate, and potassium permanganate injection systems
-
500 kw on site generator
__________________________________________________________________
Blaine, MN WTP No. 1
Engineer:
Progressive Consulting Engineers
Contract Price:
$3,340,600
Date Completed:
November
2006
-
New construction of a 2.9 MGD water treatment plant
-
Two reaction vessels and twin pressure filters were provided by Filtronics
-
Installation of a 60' air stripping tower to remove dangerous levels of groundwater contaminates
-
Extensive Landscaping
-
400 Kw on site generator
__________________________________________________________________
Blaine, MN WTP No. 2
Engineer:
Progressive Consulting Engineers
Contract Price:
$4,228,200
Date Completed: December
2005
-
New construction of a 7.9 MGD water treatment plant
-
Two reaction vessels and four 1100 gpm pressure filters were provided by Filtronics
-
The project replaced an existing well house housing two wells and a third well was added under another contract.
-
650 Kw on site generator
__________________________________________________________________
Blaine, MN WTP No. 3
Engineer:
Progressive Consulting Engineers
Contract Price:
$2,806,600
Date Completed: October
2007
-
New construction of a 2.9 MGD water treatment plant
-
Two reaction vessels and twin pressure filters from Filtronics
-
Gas chlorination system utilizing 1-ton chlorine cylinders
-
Air scrubber unit to be used in the event of a gas leak
__________________________________________________________________
Blaine, MN Lift Stations
Engineer: Pioneer Engineering
Contract Price: Varying
A total of five sewage lift stations for the city of Blaine varying from 10' x 10' square to 14' x 14' square inside dimension. All were 50' deep and sunk utilizing a caisson method of construction.
Click Here to learn more about caisson construction
__________________________________________________________________
Coon Rapids, MN East WTP
Engineer: TKDA
Contract Price:
$2,142,400
Date Completed:
May 2006
-
3.5 MGD water plant expansion project
-
Two additional pressure filters were provided by Filtronics
-
Twin cast-in-place backwash tanks were added
-
Complete removal and replacement of roofing system
-
The chemical room was retrofitted with a new monorail system
-
New reclaim & sludge pumping system
__________________________________________________________________
Coon Rapids, MN West WTP
Engineer: TKDA
Contract Price:
$3,441,500
Date Completed:
August 2003
-
A 4.3 MGD water plant expansion project
-
Two additional reaction vessels an twin pressure filters were provided by Filtronics
-
The project consisted of a sizeable building expansion including an addition to the pipe gallery below the floor
-
Complete removal and replacement of roofing system
-
The chemical room was retrofitted with a new monorail system
-
New reclaim & sludge pumping system
__________________________________________________________________
Brooklyn Park, MN WTP
Engineer: Progressive Consulting Engineers
Contract Price:
$2,431,600
Date Completed:
May 2005
-
Construction of a cast in place 3 million gallon reservoir
-
Reshaping of overflow ponds
-
Storm sewer relocation
__________________________________________________________________
Becker, MN WWTP
Engineer: Donahue & Associates with LHB
Contract Price:
$3,118,500
Date Completed: April
2004
-
Expansion of the existing wastewater treatment plant including lime stabilization equipment from RDP Technologies.
-
Soil correction including the reworking of the existing pond adjacent to the building
-
Lime storage tower
-
Aquastore sludge tank
-
An elaborate odor control system was also part of this project